AttributeValue
River Station Date Observed River Level (m) Moderate Risk Levels (m) High Risk Levels (m) Bankfull (m)
Shabelle River Belet Weyne 17-11-2017 4.65 6.50 7.30 8.30
Shabelle River Bulo Burti 17-11-2017 4.02 6.50 7.20 8.00
Shabelle River Jowhar 18-11-2017 4.70 5.00 5.25 5.50
Jubba River Dollow 26-04-2017 1.40 6.00 6.00 6.00
Jubba River Luuq 11-11-2017 5.00 5.50 6.00 7.00
Jubba River Bardheere 18-11-2017 6.90 7.40 8.20 10.40
Jubba River Bualle 18-11-2017 7.40 9.00 10.00 12.00